BDR Refuse Derived Fuel Facility, Rotherham

BDR Refuse Derived Fuel Facility, Rotherham

Client: 3SE (Shanks, Scottish & Southern Energy)
Main Contractor: Birse Civils
Package Contractor: Mansell Balfour Beatty

Structural Steelwork, Floor Decking & Shear Studs - 2000 Tonnes
Kingspan Topdek Composite Membrane Roof - 12500m²
Kingspan KS1000RW Composite Wall - 6500m²
Doors, Windows, Louvres, Curtain Walling
Rainwater goods and Siphonic Drainage
Mansafe Roof Access Systems
Access Hatches & Membrane Walkways

Sub-Contract value - c. £6.5M

 

Border Steelwork Structures provided the structural steelwork and cladding envelope for the new MBT plant at Bolton Road, Manvers.

The Main Mechanical Biological Treatment (MBT) building contains a Tipping area, Process area, a Refinement building and two 3-storey Control rooms attached to the sides.
There are also ancillary Vehicle Workshop, Substation and Visitor Centre buildings.

The BDR Waste Partnership which consists of Barnsley, Doncaster and Rotherham Councils has signed a 25 year contract for the treatment of up to 265,000 tonnes of black bag waste per year.

Case Study Market: 

Latest News

Career opportunity with BSS

14 September 2018

BSS are currently seeking a Steel Erector to join our team. • Top Rates + Pension Scheme + BUPA • Applicants must hold current CSCS cards in their respective occupations. • We would prefer applicants hold CPCS/IPAF MEWP operators cards, but this is not essential.  

Read more...

Contact Us

Border Steelwork Structures LtdWinchester House
58 Warwick Road
Carlisle
Cumbria
CA1 1DR

Telephone:
+44 (0)1228 548744

Email Us